Detailed Public Reports

Grouped reporting data by project, including merged challenges, resolutions, comments, budget notes, performance, and raw report history.

Reports Viewed

168

Raw report records returned
Projects

1

Grouped project records
Reports With Challenges

168

Issues reported
Reports With Resolutions

168

Action points provided
Total Amount Spent

82,757,109,322.00

Sum of filtered report expenditure
Average Performance

31.7%

Average across filtered report rows
Status Distribution
Pipeline
0
Ongoing
160
Stalled
1
Completed
7
Universal Primary and Secondary Education
Cluster: SOCIAL | Last Updated: 03 Mar 2026
Ongoing Medium Risk Ongoing Completed Stalled
Budget
351,794,928,991.00
Spent
82,757,109,322.00
Absorption
23.5%
Performance
31.7%
Overall Performance
31.7%
Performance
Budget Absorption
23.5%
Spent against total budget
Report Volume
168 entries
Scaled visual of entry count
Challenges
• Budgetary Cuts/ Budgetary Constraint
• None
• Late disbursement of funds
• The funds were disbursed late
• Budget constraints
• Budgetary constraints
• budgetary constraints
• Learners opted for private school due to change of curriculum Under funding
• The project had no GOK component and the donor fund ended.
• The project had no GOK funds.
• -
• Verification,mapping and uploading of pupils on NEMIS platform
• Limited resources. Availing funds for only 300 against a total all schools country wide
• Capitation is given to learners in NEMIS, Some learners have not been uploaded because they lack assessment numbers
• Challenges in getting enrolment data.
• Capitation is given basing on the learners on NEMIS. Some learners learners
• Late Disbursement of funds by National Treasury
• Limited Resources
• Budgetary constraint
• The project stalled because it had no GOK funding
• No linkage/ information sharing protocol with Teachers Service Commission who are the custodian of this data
• Late Disbursement of funds
• Underfunding
• The phasing out 8-4-4 Education system has disrupted the calenda, thus no learners in Form 1
• Limited recourses The MTPIV target is way below the actual learners in the low cost boarding
• Pre Primary is among the functions that was devolved to counties. Some times getting data on enrolment is challenging.
• Some learners are not uploaded in NEMIS, thus they don't get capitation
• Capitation is given based on the number of learners in NEMIS. Some learners have not been uploaded in NEMIS because they lack assessment number which is tied to availability of the birth certificate.
• Pre primary is a devolved function. To get data on number of pupils enrolled is come times challenging.
• Limited resources
• Late Disbursement of the funds
• Limited funds
• Funds are not enough.
• There is a bending bill for FY2023/24 that’s need to be settled first.
• The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed
• There are many stages involved in the processing of payments (MOE, NT, CBK and Kuwait), which have delayed payments to contractors thus affecting the progress of works.
• Uploading of all pupils on the NEMIS platform to generate KNEC assessment numbers
• Some learners not updated on NEMIS
• Lack of budgetary allocation
• Budgetary constrain
• Budgetary Allocations
• Enrolment in ASAL areas
• The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed.
• No budgetary allocation
• NONE
• STRAINED EXCHEQUER
Resolutions
• Budgetary Allocation
• None
• increase funding
• Funds disbursement in time
• Disbursement of funds on time
• Prioritize the project
• prioritize the project
• prioritize the schools
• The National treasury to increase capitation funds to cover all the learners
• The National treasury to increase resources to implement the programme in all the counties
• GOK funds be availed for the project The National treasury to fast-track the extension of phase II of the project
• The National treasury to negotiate with UNICEF to see whether they can have the 2nd phase of the project
• -
• KNEC fastrack uploading all pupils on the NEMIS platform hence providing assessment numbers which is key in capitation disbursement.
• NGCDF to complement by building some of the classrooms
• The capitation should not be tied to assessment numbers
• State Department for devolution to facilitate getting of data
• Funds to be disbursed in time
• Increase funding
• There need for the National treasury to look onto having phase 2 of the project.
• Ministry of Education to be compelled to liase with TSC for reporting and monitoring of the target
• Need for more Funding
• Disbursement of funds in time
• Increase resources
• increase budget
• Increase funding.
• Increase funding for for low cost boarding
• State Department for devolution to facilitate the getting the pre primary data on enrolment
• All learners in school should be given capitation There is need to enhance the issuance of birth certificate in the rural areas
• Assessment numbers should not be tied to birth certificates
• State Department for devolution to facilitate the getting of enrolment data
• More resources allocated for More learners to be covered by the project
• There is need to avail funds for construction of resource centres
• There is need to avail funds to construct more resource centres
• Provide details
• Get data from TSC
• Prioritize payment of the pending bill
• Budgetary allocation
• Fast Track the payments
• prioritize the program
• Source data from Teachers Service Commission
• KNEC to fastrack uploading of all pupils on NEMIS platform used for capitation disbursement.
• Ensure all learners to be enrolled on NEMIS
• Prioritize budgetary allocation
• Prioritize budget allocation to the project
• Prioritize budget allocation for project
• Prioritize budget allocation for planned targets
• The programme should be prioritised
• Timely exchequer release
• Adhere to scheduled implementation plan.
• Timely exchequer releases.
• Financial allocation
• budgetary allocation
• NONE
• INCREASED ALLOCATION
Comments
• Budgetary Cuts/ Budgetary Constraint
• Retention rates were high in most Low-cost boarding schools across the ASAL regions.
• continuous NEMIS update verification with assessment number
• data to be availed
• None
• Target achieved
• Target not achieved Verification and approval is Ongoing –under public participation projects-Ring-fenced schools and amount.
• Target not achieved. Verification and approval is Ongoing.
• Target not achieved
• Target not achieved, No admission made in January 2025
• The 4 counties are the ones that are implementing since FY 2022/23. This was funded by UNICEF. Since the funding ended there no plans to implement in the other counties.
• The 4 counties are the ones that were implementing since FY 2022/23. This was funded by UNICEF.
• Target for the FY achieved in Q2 and Q3
• Target not achieved. Transition to Junior School of two grades
• This indicator is reported under the infrastructure constructed/rehabilitated
• This indicator is reported under the infrastructure renovated/rehabilitated
• The project ended in the FY 2022/23
• Target not achieved. Verification and approval is Ongoing
• Gradual NEMIS/KEMIS uptake by schools for leaners upload led achievement
• Pre primary is a devolved function
• Minimum essential package is part of capitation
• 4.2 M learners were given capitation
• This Mandate was transferred to the State Department for Gender
• Target not achieved Verification and approval is Ongoing –under public participation Projects-Ring-fenced schools and amount.
• Minimum package is part of capitation
• The Project ended in the FY 2022/23.
• Minimum package is part of capitation hence captured after capitation
• The 4 counties are the ones that were implementing since FY 2022/23. The funding for project ended.
• Target not reported
• Target Achieved
• Target not achieved due to late disbursement
• Delay exchequer Releases
• Student enrolment is done in Quarter 3. The numbers are of Q3 2024/25
• Target not achieved.
• 195 school funded and undertaking approvals and construction. The completed number to be reported at end of Q3
• The project ended in 2022/23. The outstanding bill was paid in FY 2025/26
• The full access enabled the over achievement
• Enrolment reporting is done in Q3. The achievement is for Previous year's Q3 .
• A number of pupils are yet to be loaded/verified; being done using KNEC assessment numbers on NEMIS platform used for capitation
• The variance is due to the phasing out of the 8- 4-4 system, thus no Leaners in form 1 and 2.
• Enrolment reporting is done in Q3
• The budget was only enough to provide day meals to 2.6M learners against a target of 8M
• Target not achieved, to be done in subsequent quarters
• Target not achieved No budgetary allocation
• -
• Target not achieved No funds disbursed for FY 2025-26. Funds for FY 2024- 25 disbursed late, identification of project ongoing
• Target not achieved No funds disbursed for FY 2025-26. Funds for FY 2024-25 disbursed late, identification of project ongoing
• No budgetary allocation
• Target not achieved No funds disbursed for FY 2025-26.Funds for FY 2024- 25 was disbursed late, identification of project ongoing
• Enrolment is reported in Q3
• TSC to report on this
• Enrollment reporting is done in Q3
• Increased outreach campaign on inclusive education and disability mainstreaming has ensured more PWLD learners in schools
• There is a bending bill for FY2023/24 that’s need to be settled first.
• The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed
• There are many stages involved in the processing of payments (MOE, NT, CBK and Kuwait), which have delayed payments to contractors thus affecting the progress of works.
• No data provided
• No report provided
• Target not achieved . Enrollment done in Q1
• Target not acchieved
• Enrolment in ASAL areas has not been tracked
• The deviation from the initial target was due to change of the education system from 8-4-4 to CBC and as a result there were no learners in Q3 and Q4
• Target achieved. Establishment of low cost boarding schools provided more space for learners to share resources.
• Transffered
• On track
• Not started
• On track for implementation
• The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed.
• Lack of budgetary allocation
• Based on data submitted, the Indicator reads as "No. of Counties implementing the integration of duksi and madrassa into formal basic education" Where so far, the following counties have implemented: Lamu, Wajir, Mandera and Garissa
• Duksi, madrassa and PPI integrated guidelines is in process of being developed
• Target met
• NACONEK in conjunction with OOSC campaign committees managed to mobilize 25,000 OOSC back to school
• Targeted for subsequent quarters
• NONE
• STRAINED EXCHEQUER
• Uploading of learners ongoing
• Continuous NEMIS update verification with assessment number
• Gradual NEMIS/KEMIS uptake by schools for leaners upload
Budget Notes
• BUDGET WAS REMOVED DURING SUPPLEMENTARY
• NOT ALL FUNDS WERE FUNDED THROUGH EXCHEQUER OF 225,296,934
• BUDGET REMOVED DURING SUPPLEMENTARY
• FUNDED UNDER CAPITATION
• exchequer was fully released
• all the exchequer was released
• Delays in disbursement due to exchequer releases.but the funding is included in the infrastructure budget
• its part of infrastructure funding/budget
• It part of the infrastructure funding
• Budget not adequate
• The budget was removed through supplementary
• underfunding of 425,165,919 for the quater
• The was underfunding of 3,566,700,000
• Funded upto 2022/23
• the project was funded upto 2022/23
• Minimum package is part of capitation, thus captured under capitation indicator
• Preprimary education is a devolved function thus has no funding
• Pre primary is a devolved function
• No payment yet, approvals underway
• Delay exchequer release
• Delay in disbursement due to exchequer release
• There was full access to enable the required disbursement
• Its a devolved function thus has no allocation
• All the allocated funds for the quarter were utilized
Raw Report Entries
168 entries
Date Status Amount Spent Performance Challenges Recommendations Comments
03 Mar 2026 Ongoing 0.00 0.0% Budgetary Cuts/ Budgetary Constraint Budgetary Allocation Budgetary Cuts/ Budgetary Constraint
03 Mar 2026 Ongoing 0.00 0.0% Budgetary Cuts/ Budgetary Constraint Budgetary Allocation Budgetary Cuts/ Budgetary Constraint
03 Mar 2026 Ongoing 100,000,000.00 79.0% N/A N/A Retention rates were high in most Low-cost boarding schools across the ASAL regions.
03 Mar 2026 Ongoing 7,443,630,325.00 90.0% N/A N/A continuous NEMIS update verification with assessment number
03 Mar 2026 Ongoing 0.00 0.0% N/A N/A data to be availed
03 Mar 2026 Ongoing 0.00 100.0% N/A N/A N/A
03 Mar 2026 Ongoing 600,000,000.00 100.0% N/A N/A N/A
03 Mar 2026 Ongoing 400,000,000.00 99.0% N/A increase funding Target achieved
03 Mar 2026 Ongoing 0.00 0.0% Late disbursement of funds Funds disbursement in time Target not achieved Verification and approval is Ongoing –under public participation projects-Ring-fenced schools and amount.
03 Mar 2026 Ongoing 0.00 0.0% The funds were disbursed late Disbursement of funds on time Target not achieved. Verification and approval is Ongoing.
03 Mar 2026 Ongoing 0.00 0.0% Budget constraints Prioritize the project Target not achieved
03 Mar 2026 Ongoing 332,000,000.00 50.0% Budgetary constraints prioritize the project Target not achieved
03 Mar 2026 Ongoing 0.00 0.0% budgetary constraints prioritize the schools Target not achieved
03 Mar 2026 Ongoing 8,823,735,932.00 85.0% Learners opted for private school due to change of curriculum Under funding The National treasury to increase capitation funds to cover all the learners Target not achieved, No admission made in January 2025
03 Mar 2026 Ongoing 2,466,700,000.00 40.0% Budgetary constraints The National treasury to increase resources to implement the programme in all the counties Target not achieved
03 Mar 2026 Completed 0.00 0.0% The project had no GOK component and the donor fund ended. GOK funds be availed for the project The National treasury to fast-track the extension of phase II of the project The 4 counties are the ones that are implementing since FY 2022/23. This was funded by UNICEF. Since the funding ended there no plans to implement in the other counties.
03 Mar 2026 Completed 0.00 0.0% The project had no GOK funds. The National treasury to negotiate with UNICEF to see whether they can have the 2nd phase of the project The 4 counties are the ones that were implementing since FY 2022/23. This was funded by UNICEF.
02 Mar 2026 Ongoing 0.00 100.0% N/A N/A Target achieved
02 Mar 2026 Ongoing 0.00 100.0% - - Target for the FY achieved in Q2 and Q3
02 Mar 2026 Ongoing 21,755,000.00 85.0% Verification,mapping and uploading of pupils on NEMIS platform KNEC fastrack uploading all pupils on the NEMIS platform hence providing assessment numbers which is key in capitation disbursement. Target not achieved. Transition to Junior School of two grades
25 Feb 2026 Ongoing 0.00 0.0% N/A N/A This indicator is reported under the infrastructure constructed/rehabilitated
25 Feb 2026 Ongoing 0.00 0.0% N/A N/A This indicator is reported under the infrastructure renovated/rehabilitated
25 Feb 2026 Completed 0.00 0.0% N/A N/A The project ended in the FY 2022/23
25 Feb 2026 Ongoing 0.00 0.0% Limited resources. Availing funds for only 300 against a total all schools country wide NGCDF to complement by building some of the classrooms Target not achieved. Verification and approval is Ongoing
25 Feb 2026 Ongoing 1,860,907,581.00 98.0% Capitation is given to learners in NEMIS, Some learners have not been uploaded because they lack assessment numbers The capitation should not be tied to assessment numbers Gradual NEMIS/KEMIS uptake by schools for leaners upload led achievement
25 Feb 2026 Ongoing 100,000,000.00 80.0% N/A N/A Retention rates were high in most Low-cost boarding schools across the ASAL regions.
25 Feb 2026 Ongoing 0.00 99.0% Challenges in getting enrolment data. State Department for devolution to facilitate getting of data Pre primary is a devolved function
25 Feb 2026 Ongoing 0.00 0.0% N/A N/A Minimum essential package is part of capitation
25 Feb 2026 Ongoing 100,000,000.00 85.0% N/A N/A Retention rates were high in most Low-cost boarding schools across the ASAL regions.
25 Feb 2026 Ongoing 13,209,367.00 0.0% Capitation is given basing on the learners on NEMIS. Some learners learners N/A 4.2 M learners were given capitation
25 Feb 2026 Completed 0.00 0.0% N/A N/A This Mandate was transferred to the State Department for Gender
25 Feb 2026 Ongoing 0.00 0.0% Late Disbursement of funds by National Treasury Funds to be disbursed in time Target not achieved Verification and approval is Ongoing –under public participation Projects-Ring-fenced schools and amount.
25 Feb 2026 Completed 0.00 0.0% Limited Resources Increase funding Minimum package is part of capitation
25 Feb 2026 Completed 0.00 0.0% N/A N/A The Project ended in the FY 2022/23.
25 Feb 2026 Ongoing 0.00 10.0% Budgetary constraint Increase funding Minimum package is part of capitation hence captured after capitation
25 Feb 2026 Stalled 0.00 50.0% The project stalled because it had no GOK funding There need for the National treasury to look onto having phase 2 of the project. The 4 counties are the ones that were implementing since FY 2022/23. The funding for project ended.
25 Feb 2026 Ongoing 0.00 10.0% No linkage/ information sharing protocol with Teachers Service Commission who are the custodian of this data Ministry of Education to be compelled to liase with TSC for reporting and monitoring of the target Target not reported
25 Feb 2026 Ongoing 95,000,000.00 85.0% - Need for more Funding Target Achieved
25 Feb 2026 Ongoing 0.00 10.0% Late Disbursement of funds Disbursement of funds in time Target not achieved due to late disbursement
25 Feb 2026 Ongoing 0.00 10.0% - - Delay exchequer Releases
25 Feb 2026 Ongoing 1,747,741,565.00 85.0% Underfunding Increase resources Student enrolment is done in Quarter 3. The numbers are of Q3 2024/25
25 Feb 2026 Ongoing 10,416,907,503.00 10.0% The phasing out 8-4-4 Education system has disrupted the calenda, thus no learners in Form 1 increase budget Target not achieved.
25 Feb 2026 Ongoing 3,000,000,000.00 50.0% Underfunding Increase funding. N/A
25 Feb 2026 Ongoing 0.00 0.0% Late Disbursement of funds Disbursement of funds in time 195 school funded and undertaking approvals and construction. The completed number to be reported at end of Q3
25 Feb 2026 Completed 0.00 0.0% N/A N/A The project ended in 2022/23. The outstanding bill was paid in FY 2025/26
25 Feb 2026 Ongoing 285,000,000.00 100.0% Limited recourses The MTPIV target is way below the actual learners in the low cost boarding Increase funding for for low cost boarding The full access enabled the over achievement
25 Feb 2026 Ongoing 0.00 97.0% Pre Primary is among the functions that was devolved to counties. Some times getting data on enrolment is challenging. State Department for devolution to facilitate the getting the pre primary data on enrolment Enrolment reporting is done in Q3. The achievement is for Previous year's Q3 .
25 Feb 2026 Ongoing 5,450,816,211.00 81.0% Some learners are not uploaded in NEMIS, thus they don't get capitation All learners in school should be given capitation There is need to enhance the issuance of birth certificate in the rural areas A number of pupils are yet to be loaded/verified; being done using KNEC assessment numbers on NEMIS platform used for capitation
25 Feb 2026 Ongoing 36,499,705,838.00 71.0% Capitation is given based on the number of learners in NEMIS. Some learners have not been uploaded in NEMIS because they lack assessment number which is tied to availability of the birth certificate. Assessment numbers should not be tied to birth certificates The variance is due to the phasing out of the 8- 4-4 system, thus no Leaners in form 1 and 2.
24 Feb 2026 Ongoing 0.00 0.0% Pre primary is a devolved function. To get data on number of pupils enrolled is come times challenging. State Department for devolution to facilitate the getting of enrolment data Enrolment reporting is done in Q3
24 Feb 2026 Ongoing 3,000,000,000.00 33.0% Limited resources More resources allocated for More learners to be covered by the project The budget was only enough to provide day meals to 2.6M learners against a target of 8M
24 Feb 2026 Ongoing 0.00 0.0% Late disbursement of funds Funds disbursement in time Target not achieved. Verification and approval is Ongoing
24 Feb 2026 Ongoing 0.00 0.0% Late disbursement of funds Disbursement of funds in time 195 school funded and undertaking approvals and construction. The completed number to be reported at end of Q3
24 Feb 2026 Ongoing 0.00 0.0% Late Disbursement of funds Funds to be disbursed in time 195 school funded and undertaking approvals and construction. The completed number to be reported at end of Q3
24 Feb 2026 Ongoing 0.00 0.0% Late Disbursement of the funds Funds disbursement in time 195 school funded and undertaking approvals and construction. The completed number to be reported at end of Q3
24 Feb 2026 Ongoing 0.00 0.0% Late disbursement of funds Funds disbursement in time 195 school funded and undertaking approvals and construction. The completed number to be reported at end of Q3
24 Feb 2026 Ongoing 0.00 0.0% Limited funds There is need to avail funds for construction of resource centres Target not achieved, to be done in subsequent quarters
24 Feb 2026 Ongoing 0.00 0.0% Funds are not enough. There is need to avail funds to construct more resource centres Target not achieved, to be done in subsequent quarters
17 Nov 2025 Ongoing 0.00 10.0% - - Target not achieved No budgetary allocation
17 Nov 2025 Ongoing 0.00 10.0% - Provide details -
17 Nov 2025 Ongoing 0.00 10.0% - - Target not achieved No funds disbursed for FY 2025-26. Funds for FY 2024- 25 disbursed late, identification of project ongoing
17 Nov 2025 Ongoing 0.00 10.0% - - Target not achieved No funds disbursed for FY 2025-26. Funds for FY 2024-25 disbursed late, identification of project ongoing
17 Nov 2025 Ongoing 0.00 10.0% - - No budgetary allocation
17 Nov 2025 Ongoing 0.00 10.0% - - Target not achieved No funds disbursed for FY 2025-26.Funds for FY 2024- 25 was disbursed late, identification of project ongoing
17 Nov 2025 Ongoing 0.00 50.0% - - Enrolment is reported in Q3
17 Nov 2025 Ongoing 0.00 10.0% - Get data from TSC TSC to report on this
05 Nov 2025 Ongoing 0.00 85.0% - - Enrollment reporting is done in Q3
24 Sep 2025 Ongoing 0.00 50.0% N/A N/A N/A
24 Sep 2025 Ongoing 0.00 85.0% - - Target achieved
24 Sep 2025 Ongoing 0.00 85.0% - - Target Achieved
23 Sep 2025 Ongoing 0.00 10.0% - - Increased outreach campaign on inclusive education and disability mainstreaming has ensured more PWLD learners in schools
12 Sep 2025 Ongoing 0.00 10.0% There is a bending bill for FY2023/24 that’s need to be settled first. Prioritize payment of the pending bill There is a bending bill for FY2023/24 that’s need to be settled first.
12 Sep 2025 Ongoing 0.00 10.0% The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed Budgetary allocation The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed
12 Sep 2025 Ongoing 0.00 10.0% There are many stages involved in the processing of payments (MOE, NT, CBK and Kuwait), which have delayed payments to contractors thus affecting the progress of works. Fast Track the payments There are many stages involved in the processing of payments (MOE, NT, CBK and Kuwait), which have delayed payments to contractors thus affecting the progress of works.
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints prioritize the program Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
- Source data from Teachers Service Commission No data provided
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
- Source data from Teachers Service Commission No data provided
10 Sep 2025 Ongoing 0.00 10.0% - Source data from Teachers Service Commission No data provided
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
- Source data from Teachers Service Commission No report provided
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Uploading of all pupils on the NEMIS platform to generate KNEC assessment numbers KNEC to fastrack uploading of all pupils on NEMIS platform used for capitation disbursement. Target not achieved.
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 10.0% Some learners not updated on NEMIS Ensure all learners to be enrolled on NEMIS Target not achieved . Enrollment done in Q1
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize budgetary allocation Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Lack of budgetary allocation Prioritize budgetary allocation Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constrain Prioritize budget allocation to the project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize budget allocation for project Target not achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary constraints Prioritize budget allocation for planned targets Target not achieved
10 Sep 2025 Ongoing 0.00 10.0% Budgetary Allocations The programme should be prioritised Target not acchieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
- - Target Achieved
10 Sep 2025 Ongoing 0.00 60.0%
Derived from status
Enrolment in ASAL areas - Enrolment in ASAL areas has not been tracked
09 Sep 2025 Ongoing 0.00 10.0% - - The deviation from the initial target was due to change of the education system from 8-4-4 to CBC and as a result there were no learners in Q3 and Q4
09 Sep 2025 Ongoing 0.00 10.0% - - Target achieved. Establishment of low cost boarding schools provided more space for learners to share resources.
28 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
27 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Transffered
27 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
27 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
27 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
27 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
27 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
26 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
25 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A Timely exchequer release On track
25 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A Timely exchequer release On track
25 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A Timely exchequer release On track
25 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A Timely exchequer release On track
24 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A Adhere to scheduled implementation plan. Not started
24 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A Timely exchequer release On track
24 Mar 2025 Ongoing 0.00 60.0%
Derived from status
N/A Timely exchequer releases. On track for implementation
23 Feb 2025 Ongoing 0.00 60.0%
Derived from status
The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed. Financial allocation The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed.
23 Feb 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary Cuts/ Budgetary Constraint Budgetary Allocation Budgetary Cuts/ Budgetary Constraint
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
No budgetary allocation budgetary allocation No budgetary allocation
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
No budgetary allocation budgetary allocation No budgetary allocation
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
No budgetary allocation budgetary allocation No budgetary allocation
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
No budgetary allocation budgetary allocation No budgetary allocation
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed Budgetary allocation The project took too long to take off and contractors deserted sites due to financial challenges. The project has since been closed
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
No budgetary allocation budgetary allocation No budgetary allocation
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
No budgetary allocation budgetary allocation No budgetary allocation
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary Cuts/ Budgetary Constraint Budgetary Allocation Budgetary Cuts/ Budgetary Constraint
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary Cuts/ Budgetary Constraint Budgetary Allocation Budgetary Cuts/ Budgetary Constraint
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary Cuts/ Budgetary Constraint Budgetary Allocation Budgetary Cuts/ Budgetary Constraint
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
Lack of budgetary allocation budgetary allocation Lack of budgetary allocation
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
Budgetary Cuts/ Budgetary Constraint Budgetary Allocation Budgetary Cuts/ Budgetary Constraint
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Based on data submitted, the Indicator reads as "No. of Counties implementing the integration of duksi and madrassa into formal basic education" Where so far, the following counties have implemented: Lamu, Wajir, Mandera and Garissa
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Duksi, madrassa and PPI integrated guidelines is in process of being developed
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Target met
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Target met
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A NACONEK in conjunction with OOSC campaign committees managed to mobilize 25,000 OOSC back to school
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Targeted for subsequent quarters
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Target met
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
STRAINED EXCHEQUER INCREASED ALLOCATION STRAINED EXCHEQUER
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
Lack of budgetary allocation budgetary allocation Lack of budgetary allocation
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Uploading of learners ongoing
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Retention rates were high in most Low-cost boarding schools across the ASAL regions.
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A N/A
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Continuous NEMIS update verification with assessment number
22 Feb 2025 Ongoing 0.00 60.0%
Derived from status
N/A N/A Gradual NEMIS/KEMIS uptake by schools for leaners upload