Detailed Public Reports

Grouped reporting data by project, including merged challenges, resolutions, comments, budget notes, performance indicators, and raw report history.

Reports Viewed

1,170

Raw report records returned
Projects

1

Grouped project records
Reports With Challenges

1,167

Issues reported
Reports With Resolutions

1,168

Action points provided
Total Amount Spent

53,110,056,284.02

Sum of filtered report expenditure
Average Performance

25.0%

Average across filtered report rows
Status Distribution
Pipeline
3
Ongoing
1,153
Stalled
0
Completed
14
Construction of 200,000 Affordable Housing Units Annually
Cluster: INFRASTRUCTURE | Last Updated: 30 Apr 2026
Ongoing Medium Risk Ongoing Pipeline Completed
Budget
179,182,196,490.00
Spent
53,110,056,284.02
Absorption
29.6%
Performance
25.0%
Overall Performance
25.0%
Performance
Budget Absorption
29.6%
Spent against total budget
Report Volume
Showing 10 of 1,170 entries
Scaled visual of entry count
Challenges
• None
• Heavy rainfall experienced in the last 2 months continues to halt backfilling works on Block B2
• Site handover pending
• Site Handover pending
• Change of site
• Delayed access due to relocation
• Concrete batching plant experienced frequent breakdowns affecting output per day. The current land allocated for Wastewater Treatment Plant is not sufficient. Limited space to locate four power rooms proposed by electrical engineer. Low labour mobilization More electricity power outages causing delay of works since there is no backup. Insufficient water on site due to water rationing leading to slow pace of works.
• Non-correspondence of the drawings against actual measurements contributing to slow process
• Site handover Pending
• Slow work progress
• Inadequate supply of water and delayed transportation of materials from Nairobi
• Insufficient water supply and transportation of materials from Nairobi
• Delayed due to inadequate labor
• Low mobilization of labour
• Delayed access to the site due relocation
• Delayed access to site due to relocation
• Change of structural foundations
• Structural issues- Change of foundation to pile foundation
• Electrical cables near Block B present a significant safety hazard, posing a risk of electrocution to workers and causing power disruptions on-site and in the surrounding area.
• Mobilization of plants and labour not fully achieved. There are few machines on site making the work move slow. Unreliable power supply that interrupts casting of raft
• -Waiting for NEMA, NCA & county approval. -Project progress is delayed by juakali sector who has not yet commenced their activities on site. -Slow progress of works by the contractor.
• The previous consultant(Quest) resigned without official handover. The architectural drawings, structural and civil drawings, electrical drawings, mechanical drawings and relevant statutory approvals have not been issued. The new consultant ( EDON ) has not effectively taken over the project sites further slowing works.
• -Interest claims -Offsite infrastructure -NEMA approvals -Part of the site not handed to the developer -Incremental Weather conditions -Mains water and power supply - Gen Z demos affected the supply of material to the site - Relocation of existing powerlines -Extra works in sewer relocation -Delay in removal of spoils on-site by a KURA contractor
• .Sewage emanating from the adjacent scheme houses has flooded the site •Ground beam details /Drawings are yet to be availed by the consultants .Block 4 has stalled due to unresolved encroachment issues Existing sewer line relocation and design incomplete.
• Non-correspondence of the drawings against measurements contributed to slow progress
• Rain interrupted works throughout working hours
• Rain interrupted Works throughout the working hours
• Inadequate Equipments on Site
• Inadequate Equipments on site
• Slow delivery of materials to site. Poor quality of concrete works which led to stoppage of works on 2 blocks for further quality investigation 1 batching plant available on site slows down casting of rafts
• gggggggggggggggggggg
• none
• o
• Non Performance by the contractor
• NA
• Redesign of the site plan
• -
• Unstable ground conditions
• Delay in connectivity of enabling works i.e power and water
• NA • Presence of graves on site necessitating exhumation
• Slow works by the Contractor
• None • Slow progress by the contractor
• • Geotechnical survey that led to redesign of the foundations.
• • Geotechnical survey that led to redesign of the foundations
• NONE
• Project on course
• N/A
• Variations in Contract sum delayed works progress
• Not Applicable
• Delays in the release of funds to the project
• i. Inadequate skilled personnel ii. Low quality of locally supplied materials
• 0% level of construction
• Lack of locally available building materials
• Inadequate water supply to the project
• Lack of Housing Regulations of 2024 led to slow project implementation
Resolutions
• None
• An updated resourced program of works required
• SDHUD to ensure fast site handover process to accelerates work on site
• SDHUD to ensure fast site handover pending to accelerates work
• SDHUD to ensure fast site handover pending to accelerate work
• SDHUD to ensure fast site handover process to accelerate work on site
• SDHUD to make a follow up and hasten site handover process to accelerates works
• SDHUD to help in the identification of the new site to accelerate work
• SDHUD to coordinate fast and efficient relocation to accelerates work
• SDHUD to liase with the contractor on site and ensure all the issues on site are addressed to recover lost time
• SDHUD to ensure all issues raised on site are addressed to hasten works and recover delayed time
• SDHUD to liase with architect team on rectification and review of measurements to accelerates works and recover delayed time
• SDHUD to facilitate fast site handover process to accelerates work and recover delayed time
• SDHUD to ensure fast process of site handover to accelerates work and recover delayed time
• SDHUD to ensure fast site handover process to accelerates work and recover delayed time
• SDHUD to ensure fast site handover process to accelerate work and recover lost time
• SDHUD to ensure fast site handover process to accelerates works and recover delayed lost time
• SDHUD to ensure fast handover process to accelerate work and recover delayed time
• SDHUD to ensure fast site handover process to accelerates works and recover delayed time
• SDHUD to fasten site handover process to accelerates works and recover lost time
• SDHUD to ensure fast site handover process so as to accelerates work and recover lost time
• Main contractor to mobilize materials and labor to recover lost time
• Main Contractor should mobilize more materials and labor to recover lost time
• Contractor to ensure adequate supply of water and availability of the required materials on site
• Contractor to ensure adequate water supply and availability of materials on site
• Contractor to mobilize enough labor to hasten work on site
• Contractor to mobilize the availability of labor to hasten work on site
• SDHUD to accelerates work to recover lost time
• Contractor to address the structural foundation issues to hasten work on site
• Contractor to hasten the issues of structural foundation
• Contractor to ensure safety is observed on site by proper maintenance of electricity issues
• SDHUD to accelerates works to recover lost time
• SDHUD to ensure Contractor fast track work on site
• SDHUD to accelerate work to recover lost time
• SDHUD to accelarates works to recover lost time
• SDHUD to accelarates work to recover lost time
• SDHUD to accelerate works to recover lost time
• SDHUD to ensure Contractor mobilizes the availability of equipments on site
• SDHUD to ensure Contractor mobilize the required equipments on site
• SDHUD to ensure Contractor accelerates works to recover lost time
• SDHUD to ensure contractor accelerate works to recover lost time
• ggggggggggggggggggggggggggg
• none
• o
• SDHUD to ensure contractor hand over the project
• SDHUD to ensure contractor handover the project
• nonpe
• SDHUD to ensure the contractor accelerate works
• -
• NA
• SDHUD to ensure Acceleration of works by contractor
• SDHUD to ensure the contractor accelerates works
• SDHUD to ensure contractor accelerate works
• Fast tract completion
• Fastrack completion
• SDHUD to fast track connection of power and water
• SDHUD to ensure completion is fast tracked
• SDHUD to Fastrack connection of water and power
• The project retendered
• SDHUD to ensure contractor mobilise optimally
• SDHUD to ensure contractor accelerate of works
• SDHUD to Ensure contractor mobilize recourses optimally
• SDHUD to ensure the contactor accelerate works
• SDHUD to ensure accelerated works to recover the lost time
• SDHUD to ensure contractor accelerate the works
• The SDHUD to ensure developer accelerate works
• SDHUD to Ensure the contractor accelerate works to recover the lost time
• SDHUD to Ensure contractor accelerate works
• SDHUD to ensure acceleration of works
• SDHUD to ensure to contractor mobilize optimally
• SDHUD to ensure contractor has continued with the accelerated works
• SDHUD to ensure Contractor fast track finishes works
• SDHUD to ensure accelaration of works to recover the lost time
• Acceleration of works by contractor
• Acceleration of works to compensate the time lost
• The SDHUD to ensure the contractor accelerate works
• The SDHUD to ensure the contractor accelerate works to recover lost time
• SDHUD to ensure Acceleration of works by Contractor
• Fastrack
• Fastrack completion of projects
• NONE
• N/A
• Under procurement
• Not Applicable
• The Office of the Attorney General to fast-track the finalization of the Affordable Housing Regulations to enable the Affordable Housing Board to disburse funds for the project
• i. State Department for TVET to build capacity of the local community in quality workmanship ii. The contractor to build the capacity of the local suppliers
• State Department for Housing and Urban Development to establish an efficient approval system in the implementation of the Affordable Housing Project.
• State Department for Water and Sanitation to provide adequate water supply to the project
• The Attorney General to fast-track finalization of Affordable Housing Regulation.
Comments
• Construction Works Ongoing
• Preliminary site work ongoing
• Preliminary site work on site ongoing
• None
• Construction Woks Ongoing
• Construction work ongoing
• Construction works ongoing
• Construction Work Ongoing
• Construction work Ongoing
• gggggggggggggg
• none
• Project Substantially complete
• ongoing
• Preliminary works ongoing
• Completed
• project completed-Final inspection done
• Project substantially complete
• Project completed
• Finishing works ongoing
• Construction ongoing
• construction ongoing
• Final inspection done
• Final Inspection done
• preliminary works
• awarded
• o
• project substantially complete
• finishing works
• Finishing works ongoin
• The project is substantially complete
• project ongoing
• Construction Ongoing
• Construction works ongoing Project on track
• Construction ongoing Acceleration of works by contractor
• • Weather conditions causing overflowing of the adjacent river • Additional scope of external works • Delay in connectivity of enabling works i.e power and water • Slow progress by the contractor
• Construction works ongoing Slow works by contractor
• Project ongoing
• Construction works ongoing • Slow progress by the contractor
• Delays in hand over of the site
• Project on course
• Project is on course
• Under Procurement
• preliminaries construction works started
• Project almost complete
• 60 constituency affordable housing units under construction
• The project is ongoing
• • Additional scope of external works and weather conditions. • Delay in connectivity of enabling works i.e power and water.
• • Unstable ground conditions • Additional scope of external works and weather conditions • Delay in connectivity of enabling works i.e power and water • Slow progress by the contractor
• • Additional scope of external works and weather conditions • Delay in connectivity of enabling works i.e power and water.
• Project awarded
• • no response from bidders
• Contract awarded
• Project ongoing Slow progress by the contractor
• Project ongoing Inconsistent material supply and inadequate machinery
• • Geotechnical survey that led to redesign of the foundations
• Project ongoing Inadequate labour and material mobilisation by contractor
• Slow progress by the contractor
• Project ongoing Geographical survey took longer than planned
• Handed over on 20th January 2025 • Geotechnical survey • Additional Geotech due to existing caves. • Redesign of the site plan
• Project Ongoing "Low mobilisation of resources and labour
• Construction works ongoing The project was converted to developer model
• "Mobilization of plants and labour not fully achieved. There are few machines on site making the work move slow. Unreliable power supply that interrupts casting of rafts"
• Construction works ongoing poor mobilization by contractor
• Construction works ongoing contractor has accelerated works
• Construction works ongoing finishes works ongoing units fully sold out
• Construction works ongoing The contractor has accelerated works to recover the lost time
• Construction works ongoing. Existing sewer line on site causing delays in construction of some blocks.
• • Delays in contractor raising performance bond affecting project commencement
• Construction works ongoing progress on target
• Construction works ongoing Slow progress by contractor
• Construction works ongoing. • Slow progress by the contractor
• Construction works ongoing Project partially complete
• Construction works ongoing • Additional scope of external works and weather conditions • Delay in connectivity of enabling works i.e power and water • Slow progress by the contractor
• Construction works ongoing • Presence of graves on site necessitating exhumation
• Project on track
• under procurement
• Construction works ongoing The project was redesign causing some delay to accommodate more housing
• Water main passing through the site has caused delays in construction
• Construction works ongoing Target achieved
• Project Ongoing • Slow progress by the contractor
• 605 Project completed and sale ongoing
• Construction works ongoing Delays in handover of the site to contractor
• Project Ongoing
• NA
• Finishes works ongoing
• Ongoing
• -
• Finishes works ongoing, final inspection done
• Construction works ongoing.
• 52%- Construction Ongoing
• 50.34% level of construction
• 1% - Show house done
• 12% - Construction Ongoing
• Variations in Contract sum delayed works progress
• Contract awarded. Advance payment made
• 1% - Initial Stage
• Under Negotiations
• 24% - Construction Ongoing
• COntract awarded
• Contract Awarded
• Construction ongoin
• Kilimani Police
• Stalled
• Under procurement
• Handed over on 20th January 2025
• Projects ongoing
• Kehancha
• 60 constituency affordable housing units construction
• Project oncourse
• P
• Project almost completion
• Project almost completed
• construction works ongoing
• N/A
• Under negotiations
• 100% level of completion
• 1% level of completion
• 9% level of completion
• 2% level of completion
• 10% level of completion
• 4% level of completion
• 0% level of completion
• 23% level of completion
• 12% level of completion
• 20% level of completion
• 18% level of completion
• 24% level of completion
• 65% level of completion
• 60% level of completion
• 72% level of completion
• 83% level of completion
• 3% level of completion
• 21% level of completion
• 8% level of completion
• 11% level of completion
• 10.5% level of completion
• 17% level of completion
• 15% level of completion
• 5% level of construction
• 0% level of construction
• 58% level of construction
• 21% level of construction
• 1% level of construction
• 2% level of construction
• 10% level of construction
• 17% level of construction
• 7% level of construction
• 14% level of construction
• 11% level of construction
• 30% level of construction
• 4% level of construction
• 26% level of construction
• 15% level of construction
• 24% level of construction
• 6% level of construction
• 3% level of construction
• 72% level of construction
• 59% level of construction
• 49.96% level of construction
• 73% level of construction
• 66% level of construction
• 54% level of construction
• 31% level of construction
• 65% level of construction
• 57% level of construction
• 42% level of construction
• 68% level of construction
• 55% level of construction
• 38% level of construction
• 91% level of construction
• 75% level of construction
• 74% level of construction
• 45% level of construction
• 44% level of construction
• % level of construction
• 47% level of construction
• 39% level of construction
• 40% level of construction
• 18% level of construction
• 37% level of construction
• 25% level of construction
• 16% level of construction
• 83% level of construction
• 70% level of construction
• 88% level of construction achieve
• 63% level of construction
• 46% level of completion
• 24% level of construction achieved
• 25% level of construction achieved
• Finishes to show-house ongoing
• Delay caused by water passing through the site
• Delay due to sewer line on site
• Delay due to variation in contract sum
• Contract under negotiation
Budget Notes
• commitments
• o
• 00
• advance payment
• The project if financed through the developer model.
Raw Report Entries
Showing 10 of 1,170 entries
Date Status Amount Spent Performance Challenges Recommendations Comments
30 Apr 2026 Ongoing 0.00 17.0%
N/A
N/A
N/A
21 Apr 2026 Ongoing 388,196,768.84 24.0%
Heavy rainfall experienced in the last 2 months continues to halt backfilling works on Block B2
An updated resourced program of works required
N/A
25 Feb 2026 Ongoing 0.00 50.0%
N/A
N/A
Construction Works Ongoing
25 Feb 2026 Ongoing 0.00 0.0%
N/A
N/A
Construction Works Ongoing
25 Feb 2026 Ongoing 1,045,675,844.00 5.0%
N/A
N/A
Construction Works Ongoing
25 Feb 2026 Ongoing 1,045,675,844.00 5.0%
N/A
N/A
Construction Works Ongoing
25 Feb 2026 Ongoing 0.00 0.0%
N/A
N/A
Construction Works Ongoing
25 Feb 2026 Ongoing 567,768,044.00 0.0%
N/A
N/A
Construction Works Ongoing
25 Feb 2026 Ongoing 206,978,868.00 15.0%
N/A
N/A
Construction Works Ongoing
25 Feb 2026 Ongoing 0.00 10.0%
N/A
N/A
Construction Works Ongoing