Public Implementation Report

Detailed Public Reports

Search by project using a Select2-powered dropdown and view a citizen-friendly summary of project progress, budget absorption, challenges, actions taken, outcomes, and detailed reporting history.

R
Reports Viewed
36

Raw report records returned by the selected filters.

P
Projects
1

Grouped public projects available in this detailed view.

!
With Challenges
36

Reports where implementation challenges were captured.

With Resolutions
36

Reports containing responses, actions, or recommendations.

KES
Total Amount Spent
171,851,910.00

Summed expenditure across all filtered report entries.

%
Average Performance
22.8%

Average performance score from the filtered records.

C
Challenge Rate
100.0%

Share of report records with recorded challenges.

A
Action Rate
100.0%

Share of report records with resolutions or recommendations.

Find a Project Report

Use the Select2 project search, status filter, or keyword search to quickly locate public project reports.

1 Projects Visible
Quick Projects

Status Distribution

Implementation status mix across the filtered public report records.

36 Total Records
Pipeline
0.0% share
0
Ongoing
94.4% share
34
Stalled
2.8% share
1
Completed
2.8% share
1

No matching project report found

Try another project name, status, cluster, challenge, recommendation, or comment.

CA

Civil Aviation Development and Management

Cluster: INFRASTRUCTURE | Last Updated: 18 Jun 2026
Stalled High Risk Stalled Ongoing Completed
Budget
18,649,322,236.00
Spent
171,851,910.00
Absorption
0.9%
Performance
22.8%
Overall Performance
22.8%
Score
Budget Absorption
0.9%
Shows the proportion of reported expenditure against the available project budget.
Report Volume
10 of 36 Entries
Indicates the number of raw reporting records available for this project.

Public Story Board

A simplified view of what is affecting implementation, what is being done, and the latest public-facing outcome.

Challenges 3 Actions 3 Coverage 100.0%
!
Key Challenges

Issues slowing or affecting delivery

Land Issues
Delays due to E-GP system for procurement process
Capacity constraints
Cancelled PIP Application
Project not scheduled for FY 2024/2025
A demolition plan and methodology had been established but slowed down awaiting concessioning process of the airport. It is now clear that it is not possible to achieve the targeted milestones in 2024/2025. The project has been budgeted for FY 2025/2026.
Termination of the concession process to Adani Airport Group has led to nil achievement
Actions / Resolutions

Responses and recommendations captured

Sorting out a location
E-GP Exception to accelerate the procurement process
Land is not available within the airport, it is recommended that a suitabe site is identified for acquisition
Resume the work immediately
Expedite the application of PIP
Comments / Outcomes

Latest reported progress notes

The project has not commenced
Currently JKIA terminal building optimization is being undertaken
This indicator expressed as an absolute number is not the most appropriate measure for Air Navigation Services (ANS), as ANS performance is assessed based on the availability of navigation and communication systems in accordance with ICAO Standards and Recommended Practices (SARPs), which require a minimum availability of 97% to ensure there is no loss of service time (in seconds); accordingly, the appropriate Key Performance Indicator (KPI) is the percentage availability of navigation systems, against which we achieved 98%, exceeding the ICAO requirement.
Project not scheduled to commence in FY 2025/26 due to non-allocation of land
% was allocated to JKIA masterplan - the Interim Report has been submitted by the consultant 10% was allocated to detailed design and Procurement 85% was allocated to actual construction
Construction completed. The Tower building was handed over to KCAA on 15th December 2025.
KCAA and KAA are still in talks regarding the suitable location
It is scheduled to be launched in December, 2025
Challenge → Action → Outcome Flow
3 Highlighted
!
Challenge
18 Jun 2026

Land Issues

Action
Resolution / recommendation

Sorting out a location

Outcome
Stalled

The project has not commenced

!
Challenge
25 Feb 2026

Delays due to E-GP system for procurement process

Action
Resolution / recommendation

E-GP Exception to accelerate the procurement process

Outcome
Ongoing

This indicator expressed as an absolute number is not the most appropriate measure for Air Navigation Services (ANS), as ANS performance is assessed based on the availability of navigation and communication systems in accordance with ICAO Standards and Recommended Practices (SARPs), which require a minimum availability of 97% to ensure there is no loss of service time (in seconds); accordingly, the appropriate Key Performance Indicator (KPI) is the percentage availability of navigation systems, against which we achieved 98%, exceeding the ICAO requirement.

!
Challenge
25 Feb 2026

Land issues

Action
Resolution / recommendation

Land is not available within the airport, it is recommended that a suitabe site is identified for acquisition

Outcome
Ongoing

Project not scheduled to commence in FY 2025/26 due to non-allocation of land

Detailed Data Table

Raw report history is kept here for users who need the full records.

Showing 10 of 36
Date Status Amount Spent Performance Challenges Recommendations Comments
18 Jun 2026 Stalled 0.00 0.0%
Land Issues
Sorting out a location
The project has not commenced
25 Feb 2026 Ongoing 0.00 10.0%
N/A
N/A
Currently JKIA terminal building optimization is being undertaken
25 Feb 2026 Ongoing 43,005,971.00 10.0%
Delays due to E-GP system for procurement process
E-GP Exception to accelerate the procurement process
This indicator expressed as an absolute number is not the most appropriate measure for Air Navigation Services (ANS), as ANS performance is assessed based on the availability of navigation and communication systems in accordance with ICAO Standards and Recommended Practices (SARPs), which require a minimum availability of 97% to ensure there is no loss of service time (in seconds); accordingly, the appropriate Key Performance Indicator (KPI) is the percentage availability of navigation systems, against which we achieved 98%, exceeding the ICAO requirement.
25 Feb 2026 Ongoing 0.00 0.0%
Land issues
Land is not available within the airport, it is recommended that a suitabe site is identified for acquisition
Project not scheduled to commence in FY 2025/26 due to non-allocation of land
24 Feb 2026 Ongoing 128,845,939.00 10.0%
N/A
N/A
5% was allocated to JKIA masterplan - the Interim Report has been submitted by the consultant 10% was allocated to detailed design and Procurement 85% was allocated to actual construction
23 Feb 2026 Completed 0.00 85.0%
N/A
N/A
Construction completed. The Tower building was handed over to KCAA on 15th December 2025.
18 Nov 2025 Ongoing 0.00 10.0%
N/A
N/A
KCAA and KAA are still in talks regarding the suitable location
18 Nov 2025 Ongoing 0.00 10.0%
N/A
N/A
KCAA and KAA are still in talks regarding the suitable location
18 Nov 2025 Ongoing 0.00 85.0%
N/A
N/A
It is scheduled to be launched in December, 2025
18 Nov 2025 Ongoing 0.00 85.0%
N/A
N/A
On track of completion